Internal circulation laneway - 10650 Timberland Road

The proposed project

Westran Intermodal Limited is proposing to construct an approximately 350-metre-long internal circulation laneway at 10650 Timberland Road in Surrey. The construction of the laneway will require some drainage improvements which include the installation of several catch basins, associated connections, and replacing an existing drainage pipe. They are also proposing to place a new shipping container building on site to be used for ongoing operations. The container will sit on blocks and will only be connected to electricity.


Latest update

Notice of Determination

Surrey, B.C. – May 30, 2024 – The Vancouver Fraser Port Authority has determined that the proposed internal circulation laneway located at 10650 Timberland Road is not likely to cause significant adverse environmental effects.

The determination was based on a consideration of the following factors:

  • Impacts on rights of Indigenous peoples
  • Indigenous knowledge
  • Community knowledge
  • Comments received from the public
  • Technically and economically feasible mitigation measures

Best efforts were made to consult with Katzie First Nation, Kwantlen First Nation, Kwikwetlem First Nation, Musqueam Indian Band, Semiahmoo First Nation, SS'ólh Téméxw Stewardship Alliance, Tsawwassen First Nation and Tsleil-Waututh Nation. The comments raised were:

  • Confirmation of ground disturbance depths
  • A request for copies for all subsequent environmental and/or archaeological reports, should they become available.

The project was posted to the Canadian Impact Assessment Registry on April 3, 2024 for public comment. No comments were received.

The City of Surrey, DP World Fraser Surrey, TMS Transportation Ltd. And Republic Services of British Columbia were notified of the project. No comments were received.

Permit conditions taken into account in making the determination include:

  • A chance find procedure will be developed for the project, be available in the immediate working area, and project personnel will be trained on response procedures in the event that archaeological resources are encountered.
  • A spill prevention, containment and clean-up plan will be developed for the project, be available in the immediate working area, and project personnel will be trained on spill prevention, containment, and clean-up
  • An erosion and sediment control plan will be developed for the project and any works shall be carried in accordance with the sediment and erosion control measures in the plan.
  • During construction, an appropriately qualified archaeological monitor will be on the Project site at all times if ground-disturbing activities are expected to disturb soils below 1.4 metres.

The Vancouver Fraser Port Authority is satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects.

Should you require more information on the project, visit our website.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Internal circulation laneway - 10650 Timberland Road - May 30, 2024
1 Internal circulation laneway - 10650 Timberland Road - April 3, 2024

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Internal circulation laneway - 10650 Timberland Road (British Columbia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2024-04-03
  • Proponent

    Westran Intermodal Limited
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    88467
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: