Matsqui IR4 Multiuse Pathway

Matsqui First Nation is planning to build a multi-use pathway in the Matsqui 4 reserve (IR 4) residential area. The proposed gravel path will measure 225-metres long, 3-metres wide, with siting through a greenspace connecting the residential area to a local park. Two benches, pavement markings at cross walk locations, and pedestrian level bollard luminaire lights would also be installed as part of the project.


Latest update

June 4, 2024 – Infrastructure Canada has determined that the proposed Matsqui IR4 Multi-Use Pathway (the Project) is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination DOCX (13 KB) June 4, 2024
1 Matsqui IR4 Multiuse Pathway - November 28, 2023

Contacts

Infrastructure Canada
Bridget Price-Roberts, Environmental Review Officer
180 Kent st.
Ottawa, Ontario K1P 0B6
Telephone: 613-292-3834
Email: bridget.price-roberts@infc.gc.ca


  • Location

    • Matsqui IR4 Multiuse Pathway (British Columbia)
  • Nature of Activity

    • Recreation and Tourism
  • Assessment Status

    Completed
  • Start Date

    2023-11-28
  • Proponent

    Matsqui First Nation
  • Authorities

    • Infrastructure Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    86118
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: