Document CN rail bridge seismic retrofit project
- Project CN rail bridge seismic retrofit project
- Document Category: Additional Information
- Reference Number: 3
- Updated: 2021-04-01
- Document: 138581E.html
- Relevance: 292.24
- Notice of Determination Spanning the Fraser River between New Westminster and Surrey, directly upstream from the Pattullo Bridge, B.C. –April 1, 2021– The Vancouver Fraser Port Authority has determined that the proposed CN Rail Bridge seismic retrofit project located at Spanning the Fraser River between New Westminster and Surrey, directly upstream from the Pattullo Bridge is not likely to cause ...
1 alternate format found
French HTML
- Relevance: 241.24
- Avis de détermination Projet de renforcement parasismique du pont ferroviaire du CN enjambant le fleuve Fraser River entre New Westminster et Surrey, juste en amont du pont Pattullo, C.-B. – 1er avril 2021– L'Administration portuaire Vancouver-Fraser a déterminé que le projet de renforcement parasismique du pont ferroviaire du CN qui enjambe le fleuve Fraser entre New Westminster et Surrey, juste en amont du pont Pattullo, C.-B., ...