Pohénégamook-Picard-Saint-Antonin-Wolastokuk Wind Farm Project

Registry Search Mobile

Registry Search

Skip to Filters

8 results

Document Minister's Response

  • Project Pohénégamook-Picard-Saint-Antonin-Wolastokuk Wind Farm Project
  • Document Category: Additional Information
  • Reference Number: 3
  • Document Date: 2024-11-18
  • Document: 159678E.html
  • Relevance: 348.23
  • Minister's Response Physical Activities Énergie éolienne PPAW s.e.c. is proposing to construct and operate a wind farm located in the regional county municipalities (RCMs) of Kamouraska, Témiscouata, and Rivière-du-Loup in Bas-Saint-Laurent, Quebec. As proposed, the Pohénégamook–Picard–Saint-Antonin–Wolastokuk Wind Farm Project (the project) would involve the construction of 56 windmills with a total capacity of 349.8 MW and would include a road network, a substation to the Hydro-Québec ...
1 alternate format found
French HTML
  • Relevance: 297.23
  • Réponse du ministre Activités concrètes Énergie éolienne PPAW s.e.c. propose la construction et l'exploitation d'un parc éolien situé dans les municipalités régionales de comté (MRC) de Kamouraska, de Témiscouata et de Rivière-du-Loup au Bas-Saint-Laurent, Québec. Tel qu'il est proposé, le projet de parc éolien Pohénégamook–Picard–Saint-Antonin–Wolastokuk (le projet) prévoit la construction de 56 éoliennes pour une puissance totale de 349,8 MW et comprendrait un réseau de chemins, un poste ...

Document Analysis Report

  • Project Pohénégamook-Picard-Saint-Antonin-Wolastokuk Wind Farm Project
  • Document Category: Additional Information
  • Reference Number: 4
  • Document Date: 2024-10-31
  • Document: 159688E.pdf
  • Relevance: 346.54
  • Analysis Report DESIGNATION REQUEST FOR THE POHÉNÉGAMOOK–PICARD–SAINT- ANTONIN–WOLASTOKUK (PPAW) WIND FARM PROJECT IN QUEBEC PURSUANT TO THE IMPACT ASSESSMENT ACT October 31, 2024 IMPACT ASSESSMENT AGENCY OF CANADA ANALYSIS REPORT – PPAW WIND FARM PROJECT i © His Majesty the King in Right of Canada, as represented by the Minister of ...
3 alternate formats found
English HTML
  • Relevance: 346.54
  • Analysis Report Designation request for the Pohénégamook–Picard–Saint-Antonin–Wolastokuk (PPAW) wind farm project in Quebec pursuant to the impact assessment act October 31, 2024 © His Majesty the King in Right of Canada, as represented by the Minister of Environment and Climate Change, 2024 This publication may be reproduced for personal or internal use without permission, provided the source is fully acknowledged. However, multiple copy reproduction of this publication in whole or in ...
French PDF
  • Relevance: 295.54
  • Rapport d’analyse DEMANDE DE DÉSIGNATION DU PROJET DE PARC ÉOLIEN POHÉNÉGAMOOK – PICARD–SAINT-ANTONIN–WOLASTOKUK (PPAW) AU QUÉBEC CONFORMÉMENT À LA LOI SUR L’ÉVALUATION D’IMPACT 31 octobre 2024 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA RAPPORT D’ANALYSE – PROJET DE P ARC ÉOLIEN PPAW i © Sa Majesté le Roi du chef du Canada, représentée par le ministre ...
French HTML
  • Relevance: 295.54
  • Rapport d'analyse Demande de désignation du projet de parc éolien Pohénégamook–Picard–Saint-Antonin–Wolastokuk (PPAW) au Québec conformément à la Loi sur l'évaluation d'impact 31 octobre 2024 © Sa Majesté le Roi du chef du Canada, représentée par le ministre de l'Environnement et du Changement climatique, 2024. Cette publication peut être reproduite sans autorisation pour usage personnel ou interne dans la mesure où la source est indiquée en entier. Toutefois, la reproduction multiple de ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Document Category Display Filters

Date modified: